New construction in the energy sector

 

More than 30,000 MW installed around the world.

  • 58 Simple Cycle Gas Turbines. 6720 MW
  • 56 gas turbines and 41 steam turbines in Combined Cycle. 16882 MW
  • Multiple references in the installation of steam turbines in industrial installations.
  • Hydraulic turbines.
  • Diesel engines oriented to electric generation.

Additionally, the company has participated in the installation of the steam turbo-generators of the large Coal and Fuel Oil Power Plants, with 22 turbo-alternators installed and 6,615 MW, with technologies such as WESTINGHOUSE, GENERAL ELECTRIC, MITSUBISHI, SIEMENS and BBC

Conventional Thermal: 31,000 MW installed

Multiple references in installation of turbo-alternators and auxiliary equipment in the last 28 years with more than 30,000 MW installed in conventional thermal power plants:

Simple Cycle Gas Turbines: 6720 MW installed.

  • GENERAL ELECTRIC – 11 units – 1,377 MW installed
  • ALSTOM – 8 units – 316 MW installed
  • SIEMENS – 37 units – 4.927 MW installed
  • PRATT&WHITNEY – 2 units – 100 MW

Gas and steam turbines in Combined Cycle: 16,882 MW installed.

  • ALSTOM – 8.368 MW installled
    • 24 Gas Turbines
    • 21 Steam Turbines
  • GENERAL ELECTRIC – 4.234 MW installed
    • 16 Gas Turbines
    • 10 Steam Turbines
  • SIEMENS – 2.680 MW installed
    • 12 Gas Turbines
    • 6 Steam Turbines
  • MITSUBISHI – 1.600 MW installed
    • 4 Gas Turbines
    • 4 Steam Turbines

Large steam turbines in conventional power plants: 6,615 MW.

  • WESTINGHOUSE, GENERAL ELECTRIC, MITSUBISHI, SIEMENS y BBC
    • 22 turbo-alternators assembled.

Diesel engines were also installed during this period for electric generation.

Hydro Turbines

  • Flagship project: CH San Esteban II installation: Francis type hydro turbine, generator and auxiliary equipment of 178 MW VOITH, 200 m3/s.
  • Other Units installed in Spain.
    • VOITH, Andritz, SULZER, NEYRPYC
  • Synergies with DFOM for this kind of projects for Penstocks, Spiral Cases, Draft Tubes, Trash Racks, Gates…

Steam turbines in solar and industrial sites: Steel mills, Paper mills, Waste to energy, Biomass, Cogeneration, LNG Reciprocating Compressors

Thermo-Solar Power plants

  • Andasol III (Granada) – UTE MSM/DF
    • Df Mompresa has carried out the assembly of the turbo-alternator, its auxiliary equipment and the interconnection piping of this Plant. MAN 50 MW – 1 unidad – 50 MW Solar

Waste to energy

  • TIRME New erection of garbage incineration plant.
    • Steam turbine-generator 35 MW MITSUBISHI-ALSTOM

Cogen

  • Ence mechanical erection of turbogenerator navia
    • ST turbine, Geno, Condenser & auxiliary equipment SIEMENS 31,21+40 mw
    • ST turbine, Geno, Condenser & auxiliary equipment SIEMENS 50 mw

Biomass

  • Becosa New erection biomass plant Málaga.
    • Peter brotherhood 3,45 mw ST turbine, gen and aux.
  • Econoler biomass plant mechanical erection of turbogenerator for (cabra – córdoba).
    • Peter brotherhood 3,45 mw ST turbine, gen and aux.

LNG Reciprocating compressor

  • ·Fluxys: 5th tank and BOG Compressors Expansion Project (Belgium)
    • 4x HP/LP Boil Off Gas Reciprocating Compress and aux 12.6/17.2 ton/h