More than 30,000 MW installed around the world.
- 58 Simple Cycle Gas Turbines. 6720 MW
- 56 gas turbines and 41 steam turbines in Combined Cycle. 16882 MW
- Multiple references in the installation of steam turbines in industrial installations.
- Hydraulic turbines.
- Diesel engines oriented to electric generation.
Additionally, the company has participated in the installation of the steam turbo-generators of the large Coal and Fuel Oil Power Plants, with 22 turbo-alternators installed and 6,615 MW, with technologies such as WESTINGHOUSE, GENERAL ELECTRIC, MITSUBISHI, SIEMENS and BBC
Conventional Thermal: 31,000 MW installed
Multiple references in installation of turbo-alternators and auxiliary equipment in the last 28 years with more than 30,000 MW installed in conventional thermal power plants:
Simple Cycle Gas Turbines: 6720 MW installed.
- GENERAL ELECTRIC – 11 units – 1,377 MW installed
- ALSTOM – 8 units – 316 MW installed
- SIEMENS – 37 units – 4.927 MW installed
- PRATT&WHITNEY – 2 units – 100 MW
Gas and steam turbines in Combined Cycle: 16,882 MW installed.
- ALSTOM – 8.368 MW installled
- 24 Gas Turbines
- 21 Steam Turbines
- GENERAL ELECTRIC – 4.234 MW installed
- 16 Gas Turbines
- 10 Steam Turbines
- SIEMENS – 2.680 MW installed
- 12 Gas Turbines
- 6 Steam Turbines
- MITSUBISHI – 1.600 MW installed
- 4 Gas Turbines
- 4 Steam Turbines
Large steam turbines in conventional power plants: 6,615 MW.
- WESTINGHOUSE, GENERAL ELECTRIC, MITSUBISHI, SIEMENS y BBC
- 22 turbo-alternators assembled.
Diesel engines were also installed during this period for electric generation.
Hydro Turbines
- Flagship project: CH San Esteban II installation: Francis type hydro turbine, generator and auxiliary equipment of 178 MW VOITH, 200 m3/s.
- Other Units installed in Spain.
- VOITH, Andritz, SULZER, NEYRPYC
- Synergies with DFOM for this kind of projects for Penstocks, Spiral Cases, Draft Tubes, Trash Racks, Gates…
Steam turbines in solar and industrial sites: Steel mills, Paper mills, Waste to energy, Biomass, Cogeneration, LNG Reciprocating Compressors
Thermo-Solar Power plants
- Andasol III (Granada) – UTE MSM/DF
- Df Mompresa has carried out the assembly of the turbo-alternator, its auxiliary equipment and the interconnection piping of this Plant. MAN 50 MW – 1 unidad – 50 MW Solar
Waste to energy
- TIRME New erection of garbage incineration plant.
- Steam turbine-generator 35 MW MITSUBISHI-ALSTOM
Cogen
- Ence mechanical erection of turbogenerator navia
- ST turbine, Geno, Condenser & auxiliary equipment SIEMENS 31,21+40 mw
- ST turbine, Geno, Condenser & auxiliary equipment SIEMENS 50 mw
Biomass
- Becosa New erection biomass plant Málaga.
- Peter brotherhood 3,45 mw ST turbine, gen and aux.
- Econoler biomass plant mechanical erection of turbogenerator for (cabra – córdoba).
- Peter brotherhood 3,45 mw ST turbine, gen and aux.
LNG Reciprocating compressor
- ·Fluxys: 5th tank and BOG Compressors Expansion Project (Belgium)
- 4x HP/LP Boil Off Gas Reciprocating Compress and aux 12.6/17.2 ton/h