Krishnapatnam port project phase ii. coal handling facility for northern port
Belt Conveyor System 4,400 tph for Coal. One (1) Stacker Reclaimer 3,300/1,700 tph. Nine (9) Transfer Towers for coal circuits. Dust Suppression at Coal Stockyard
Belt Conveyor System 4,400 tph for Coal. One (1) Stacker Reclaimer 3,300/1,700 tph. Nine (9) Transfer Towers for coal circuits. Dust Suppression at Coal Stockyard
New materials handling system for iron ore integrated with the existing plant: One (1) stacker 2,500 tph. One (1)stacker 1,000 tph. One (1) bucket wheel
Customer Location Date Description Type (*) CARBOEX ENDESA, S.A. Ferrol Port. Galicia – SPAIN 2001 New Terminal for Imported Coal DFS C.V.G. FERROMINERA ORINOCO, C.A.
Stacker. 1,100 tph. Belt Conveyor 310 m. Belt Conveyor 27 m.
Three Belt Conveyor 320 tph each. Radial Stacker 320 tph, 35 m. Dust suppression system. Control system.
One Concentrate Stacker 3,000 tph. One Double Bucket Wheel Bridge Reclaimer 3,000 tph. One Bucket Wheel Reclaimer 3,000 tph. Belt Conveyor System 3,000 tph. Total
Belt Conveyor System 4.800 tph. Two (2) Shipunloaders FDR 2.400 tph / CDR 2.800 tph Two (2) Stackers 4.800 tph Two (2) Reclaimers 3.840 tph
Conveying and storage units for sulphur, including: Sulphur transport system by belt conveyors. Transference Powers and silo buildings. Truck loading station. Dust Collection system. Truck
Storage Yard 85 x40 m (under roof). Capacity: 23.200 m3. One tubular belt conveyor 200 m, 475 t/h. Pet-coke Conveying System. Crushing Station 475 t/h.
One Stacker machine 1000 t/h. One Reclaimer 1,250 t/h (Revamping, transport, erection and commissioning). Belt conveyor circuit 1000-1200 t/h. System of transference towers. Dust suppression
Jetty Hopper and material facilities for Iron Ore: Steel Hopper. Extractor – dosing machine. Electric and control system. Power connection to feed the ship.
Iron Ore Wagon Tripper: 24 tips/hour Iron Ore Stacker 1,500 tph. Iron Ore Bucket Wheel Reclaimer 5,400 tph. Iron Ore Shiploader 5,400 tph; 200,000 DWT