Tierra Amarilla Simple Cycle Power Plant (160 MW)
Gas turbines: SGT5-2000E (Siemens) Turnkey Contract Basic and detail engineering, civil works, equipment supply, complete electromechanical erection, Commissioning and start up
Generación eléctrica,
Gas turbines: SGT5-2000E (Siemens) Turnkey Contract Basic and detail engineering, civil works, equipment supply, complete electromechanical erection, Commissioning and start up
Coal Fired Power Plant Rehabilitation (4 Units x 350 MW/each) Contract type: Turnkey Contract/ Consortium Agreement Scope of work: Complete electromechanical Erection, Mills Manufacturing and
Velilla Coal Fired Power Plant. Group II (1 x 350 MW). Flue Gas Desulphurization. Technology: Wet Limestone technology Contract type: EPC Contract/MHI Consortium Partner. Scope
Monfalcone Power Plant- Units I and II- Desulphurization (170 MW/unit). Wet limestone Technology Scope of work: Detailed engineering; Civil Works; Supply of equipment, piping and
Compostilla Coal Fired Power Plant (Units IV and V) desulphurization (350 MW/unit). limestone technology Contract Type: MHI Consortium partner Scope of Work: Detail Engineering, Aborbers
GT: 2 x 9 FB (GE) Contract type: EPC Contract/Consortium Partner GE Scope of work: BOP basic and detail engineering, BOP equipment supply, civil works,
GT: GT26 (ALSTOM). Contract type: EPC Contract/Consortium agreement with ALSTOM Power. DF Scope of work: BOP and civil basic and detail engineering, BOP Equipment supply
Teruel Coal Fired Power Plant. Revamping of Units I, II and III Flue Gas Desulphurization (350 MW/each). Technology: Wet Limestone technology. Contract type: EPC Contract/MHI
Kallpa Simple Cycle Power Plant (1×180 MW) GT:SGTG-5000F(Siemens) Scope of work: Plant Basic and Detail Design, Equipment supply , Civil Works, Plant Erection and Commissioning.
Open Cycle Power Plant (2 x170 MW) GT: 2xSGT6-4000F DF Scope of supply:BOP and integration Engineering, Civil works, BOP equipment supply, erection and commissioning
Combined Cycle Power Plant (230 MW) Gas turbines: 2 x 6FA+ (GE) Contract type: “Turnkey Contract” Scope of work: Plant Basic and Detail Design, Equipment
Combined Cycle Power Plant (230 MW). Gas turbines: 2 x 6FA+ (GE). Contract type: Turnkey Contract. Scope of work: Plant basic and detail design, Power