Duro Felguera | Cotización

Mining & Handling

Reference projects

Revamping of Coke Handling System in a Refinery

PEMEX Refinación

Madero Refinery, Veracruz. Mexico

  • Reception system with hopper and crusher (2). Belt conveyor system to train wagon loading.
  • Train loading station with primary hopper of 400 t and secondary hopper of 100 t. Hydraulic helmet closures (3) for wagon loading. Truck scale.
  • Deviation system and barge loading feeder.
  • Dust collection system integrated.