Duro Felguera | Cotización

Mining & Handling

Reference projects

Phase II of an Iron Ore 12 Mty Concentration Plant

C.V.G. FERROMINERA ORINOCO, C.A.

Ciudad Piar, Venezuela

  • One Concentrate Stacker 3,000 tph.
  • One Double Bucket Wheel Bridge Reclaimer 3,000 tph.
  • One Bucket Wheel Reclaimer 3,000 tph.
  • Belt Conveyor System 3,000 tph. Total length approx. 3 km. Auxiliary systems: infrastructures and civil buildings, power distribution for all facilities.

Process Plant

The Process Plant consist of two separate mirror image processing lines with parallel main equipment and a number of services in common for both plants. Main equipment is described as follow:

  • Two (2) Ball Mill
  • Fourteen (14) Cyclones Modules
  • Twelve (12) Hydrosizers
  • Twenty (20) Banks of Rougher Spirals
  • Six (6) Banks of Scavenger Spirals
  • Sixteen (16) Medium Intensity Magnetic Separators
  • Four (4) Primary Wet High Intensity Magnetic Separators
  • Four (4) Secondary Wet High Intensity Magnetic Separators
  • Six (6) Rougher Column Flotation Cells
  • Six (6) Cleaner Column Flotation Cells
  • Two (2) Belt Filters
  • Two (2) Concentrate Thickeners
  • Two (2) Tailing Thickeners
  • Tailing Dam designed for 20 years.
  • Water Storage Facilities.