Duro Felguera | Cotización

Conventional Energy

Reference projects

Open cycle power plant with a total capacity of 80 MW

Endesa-Italia

Cerdeña (Italia)

  • Execution period: 8 and a half months.
  • Plant Capacity: 2 x 40 MW.
  • GTs: 2 x LM6000 (GE).
  • Contract type: Turn Key EPC Contract.
  • Scope of work: Plant Basic & detail design, Power Island supply, Civil works, BOP equipment supply, erection and commissioning.