Duro Felguera | Cotización

New platform design for repair work on blast furnace hearths

Trabaja con nosotros

With this project, DF Operaciones y Montajes designs and validates a new platform to perform repair work inside blast furnaces.

This new design will allow the platform to be perfectly adapted to the uneven walls of blast furnace hearths and be moved inside without the need to fully disassemble the top hopper, reducing the intervention times.

Duro Felguera bets on young talent and joins Recruiting Erasmus programme

Duro Felguera has recently joined Recruiting Erasmus, an initiative led by PeopleMatters, a consultancy firm specialising in people management, which aims to facilitate contact between partner companies and Spanish and foreign students, whether through an Erasmus scholarship or another training programme, who want to make the leap into the professional world.