Duro Felguera | Cotización

Mining & Handling

Reference projects

Handling System for Cement in the Port Terminal of Carboneras Plant

HOLCIM España

Carboneras Plant, Almeria. Spain

  • Shiploader 1,200 t/h including travel, slew and luffing System (hydraulic).
  • Belt Speed: 1.68 m/s. and Belt width: 1,400 mm.
  • Intermediate conveyor 42 m. and 1,200 t/h from wharf to shiploader.
  • Dust collection system integrated.
  • Radio control.
  • Telescopic chute 13 m. with Rotary spoon.