Andasol III Solar Thermal Power Plant (1 x 50 MW)

UTE Andasol III/ Marquesado Solar

Granada, Spain

  • Mechanical erection of piping and equipments of TES and PB/BOP area. Turbine insulation material. Supply and installation of thermal insulation both for piping and salt melting equipment Suply of expanded PTFE board. Insulation supply and for the piping TES area. Piping, power block & BOP equipment thermal insulation. Supply and installation of the thermal insulation for the enclosure and roof of two salt tanks. Thermal insulation erection for the process pipe of the power group. Piping insulation of the solar field Supply and erection of pipes HTF area equipment.
  • Operation and maintenance services. Warehouse Management, Training and Start – up.