Thermoelectrical power plant of La Sierra – 2 x 150 MW

Empresas Públicas de Medellín (Colombia)

Puerto Nare - Antioquia - (Colombia)

  • Engineering, civil works, supply, transport, erection, start-up of the thermoelectric power plant of La Sierra. (single cycle with 2 x 150 MW gas turbo-generator, each manufactured by General Electric.) The first stage of the project (start-up of the first gas turbine) was finished 1 month before the dead line of the contract. The project was carried out in joint venture with General Electric (USA).